Manufacturing excellence since 1973

Case Studies

Previous Projects

Explore Our Latest Case Studies

Here we can showcase the successful implementation of Power Plastics’ innovative solutions across various industries. Explore detailed accounts of our projects, highlighting the challenges we’ve addressed, the bespoke solutions we’ve developed, and the tangible benefits delivered to our clients. Discover how our expertise and commitment to quality have made a difference in real-world applications.

Power Plastics designed, manufactured and installed potable (drinking) water covers for Affinity Water at their Chertsey Water Treatment Works in London.
Power Plastics partnered with Severn Trent and Suez to install a world-first Net Zero cover solution at Severn Trent’s Strongford sewage treatment works in Staffordshire.
In 2020 Power Plastics extended it’s supply of tent solutions to the UK MOD after securing the overall tender for the delivery of accommodation tents.
Power Plastics designed, manufactured and installed a 2744m3 ground mounted double membrane gas holder at Severn Trent’s Finham Waste Water Treatment Works.
In 2019 The Arena on Abu Dhabi’s Yas Island hosted the UFC 242 clash Khabib vs. Poirier. The fight was viewed by an estimated 112m people worldwide and took place in a custom built, temporary fabric arena
Design, Manufacture and installation of eight 30m span Aluminium framed structures with removable PVC covers and integral central walkways.
Design and manufacture of a tensile fabric weatherproof containment system for two nuclear reactors, as part of the decommissioning process

Find your cover solution today